| OVERHAULING OF STEAM TURBINES |
|---|
A major overhaul is a detailed inspection and overhaul of the entire steam turbine generator set including the turbine casing, rotor, seals, and bearings; the generator; and auxiliaries such as the gear, couplings, lubrication system and controls. An STG should be overhauled every 5 years.